First build of the off season
#1
Thread Starter
My Feedback: (12)
First build of the off season
This is something I've needed to do for a while. Started clearing space a couple weeks ago and got the holes dug for the "foundation". The wood arrived this Wed. I finished leveling the piers yesterday morning before I had to go to a skating party. Today's mission was to get the base platform done. If you look at the piles of wood you'll see that Lowes was nice enough to make me move all the wood for the rafters before I could get to the stuff I needed to use first. Finished off that and got the base platform done. Next step will be the plywood and then I'll start with the walls.
The building will be 12 by 12 with a 12/12 pitch roof. I'll build a couple lofts inside to give me space for storing stuff. My goal is to be able to fit all the lawn and garden stuff inside so I have more space for the workshop in the garage.
The building will be 12 by 12 with a 12/12 pitch roof. I'll build a couple lofts inside to give me space for storing stuff. My goal is to be able to fit all the lawn and garden stuff inside so I have more space for the workshop in the garage.
#6
My Feedback: (1)
Join Date: Oct 2002
Location: Long Island,
NY
Posts: 843
Likes: 0
Received 0 Likes
on
0 Posts
RE: First build of the off season
Hi Chuck
Looks like a nice project. Good luck and keep us post on the build.
I did the same thing for getting room in the garage back in 1997 .
I built my shed 10 X 12 , I started May 1 and finished May 11 with help from my son's .
Now 10 years later I could use a bigger shed . LOL !
A few pic's of my build.
Steve
Looks like a nice project. Good luck and keep us post on the build.
I did the same thing for getting room in the garage back in 1997 .
I built my shed 10 X 12 , I started May 1 and finished May 11 with help from my son's .
Now 10 years later I could use a bigger shed . LOL !
A few pic's of my build.
Steve
#8
Thread Starter
My Feedback: (12)
RE: First build of the off season
Made a bit of progress after work the last two days. The walls that were built, but piled on the floor are now up and leveled. Next session will be applying the sheathing. Normally this can go on while the wall is on the ground, but I decided it'd be easier to lift the walls without it.